Every size. Every operating condition.
GESPHC welcomes confidential inquiries from owners and authorized representatives concerning operational facilities, former enterprise computing sites, mothballed datacenters, unfinished developments, and other computing infrastructure assets.
Capacity must mean what it says
Size classifications use verified IT load capacity—not total facility electrical service. Utility service capacity, contracted capacity, currently available capacity, historical capacity, and potential expansion are separate facts. Unknown IT capacity remains unclassified.
| Classification | Verified IT load capacity |
|---|---|
| Small | Less than 1 MW |
| Medium | 1 MW to less than 10 MW |
| Large | 10 MW to less than 50 MW |
| Huge | 50 MW through 200 MW |
| Gargantuan | Greater than 200 MW |
| Unknown | Capacity not verified |
Infrastructure before assumptions
Existing electrical service, substation access, cooling, water, fiber, equipment condition, zoning, and expansion potential inform evaluation. Preliminary research cannot guarantee utility availability, interconnection approval, or development feasibility.